Job Details

Menu

How To Install Renofy

JB

Full Bathroom Renovation

In Progress
  • Full bathroom strip-out
  • Relocate bath and toilet
  • Install non-electric shower
  • Tile with metro tiles, brick pattern
  • Retain exposed floorboards

Full bathroom renovation required: remove all existing fixtures, retain sink in current location, relocate bath to back wall by window and toilet to new position, remove electric shower and install new non-electric shower over bath, tile metro tiles in brick pattern with curving metal trim around bath, window, and sink areas, grout to be selected by tradesperson, floorboards to remain exposed. Decorating to be completed separately. I have attached photos giving an example of the layout I would like. All materials supplied by customer.

Bathroom Fitter Plumber Tiler
Loading milestones...