Job Details

Menu

How To Install Renofy

TB

Cavity Tray Installation Above First-Floor Window

Not Started
  • Check for existing cavity tray
  • Inspect weep holes for blockage
  • Assess space for new tray
  • Install new tray if possible

Investigate whether there is an existing cavity tray whose weep holes are blocked above rear first-floor window. Blue squiggle on photo shows area. Access is from the roof of the lean-to extension with appropriate scaffolding to be supplied for the works.
If no tray is present, assess whether there is enough space to install a new tray. If so, install new cavity tray extending at either side beyond the window.

Bricklayer